Modern electrical installations demand solutions that balance reliability, adaptability, cost-effectiveness, and safety. The Low Voltage Busbar Trunking System (BTS) has emerged as a superior alternative to traditional cable installations in many applications. The authoritative BEAMA Guide to Low Voltage Busbar…

Introduction

Modern electrical installations demand solutions that balance reliability, adaptability, cost-effectiveness, and safety. The Low Voltage Busbar Trunking System (BTS) has emerged as a superior alternative to traditional cable installations in many applications. The authoritative BEAMA Guide to Low Voltage Busbar Trunking Systems Verified to BS EN 61439-6 provides comprehensive technical guidance on these systems. This article explains key aspects of BTS for contractors, specifiers, and facility managers.

What is a Busbar Trunking System?

A Busbar Trunking System is an enclosed electrical distribution system comprising solid conductors—typically copper or aluminium—separated by insulating materials and housed within a protective enclosure. Available in ratings from around 25 amps up to 6,300 amps, BTS offers a robust alternative to running multiple cables for high-capacity power distribution.

Two Core Applications

BTS installations fall into two main categories:

Distribution Busbar Trunking features tap-off outlets on one or more faces, allowing power to be tapped off at multiple points along the run. This is the most common application, ideal for supplying lighting systems, factory floor distribution, and rising mains in office or apartment blocks.

Feeder Busbar Trunking has no tap-off outlets and serves to interconnect switchboards or connect transformers to switchboards. It is particularly economical for higher current ratings where multiple single-core cables would otherwise be needed.

Why Choose Busbar Over Cable?

Busbar trunking offers several distinct advantages over traditional cable installations:

Installation Efficiency

Contractors can achieve significant savings on materials and labour. Busbar trunking requires fewer fixings per metre than cable, with reduced installation time.

Flexibility and Adaptability

Multiple tap-off outlets provide flexibility to accommodate changing power requirements after initial installation. Repositioning distribution outlets is simpler, and the system is easily extendable.

Space Optimisation

Bends and offsets can be installed in a much smaller area than the equivalent cable run, which requires larger bending radii.

Verified Performance

Busbar trunking systems are engineered products with proven performance verified to recognised international and national standards, including BS EN 61439-6.

Fire Resistance

Busbar trunking systems provide better resistance to the spread of fire, with specific Fire Barrier BTU units designed to prevent fire propagation through building divisions.

Key Components of a Busbar System

A complete busbar installation comprises several standard component types:

Feed Units and End Caps connect the system to the existing electrical network. They can bolt directly into switchboards or be cable-connected via an upstream protective device.

Run Components (straight lengths) form the bulk of the installation, available in standard lengths with custom-engineered options available.

Direction Changes are handled with fixed angle brackets, elbows, tees, and flexible joints that maintain a continuous run.

Tap-Off Units are among the most important components. They distribute power to individual final loads and typically contain overcurrent protection devices such as fuses (BS EN 60269-1), miniature circuit breakers (BS EN 60898), or moulded case circuit breakers (BS EN 60947-2).

Technical Specifications

Short-Circuit Performance

Busbar trunking systems are designed to withstand the effects of short-circuit currents. The short-circuit withstand rating is expressed as:

  • Rated short-time withstand current (Icw) – the rms current the system can withstand for a specified period
  • Rated peak withstand current (Ipk) – the instantaneous peak current the system can withstand
  • Rated conditional short-circuit current (Icc) – when protected by specific short-circuit protective devices

Voltage Drop

Voltage drop figures are provided by manufacturers in mV/A/m format. The calculation considers resistance (which varies with temperature) and reactance. For distributed loads along the trunking, the full load voltage drop may be divided by approximately two to give the approximate voltage drop at the end of the system.

Electromagnetic Fields (EMF)

Busbar trunking systems are often better suited than cables when low magnetic induction is required. The BTS construction facilitates the optimum arrangement of conductors to keep magnetic interference to a minimum. In sandwich-type construction, conductors are closely packed, and induced magnetic fields cancel each other to a large extent, resulting in extremely low external magnetic fields.

Aluminium vs Copper Conductors

Both materials are viable for power busbar trunking systems:

Aluminium offers lower density, resulting in a system approximately 30% lighter than an equivalent copper system, though overall dimensions are typically 10–20% larger.

Copper has higher conductivity, resulting in voltage drop approximately 25% lower and power losses typically 25% lower than aluminium for the same current rating.

Harmonic Considerations

Modern loads with electronic components generate harmonic currents that affect neutral conductor sizing. BS 7671 requires the neutral conductor to be no smaller than line conductors when total harmonic distortion exceeds 15%. For circuits supplying significant electronic single-phase loads, the neutral current can reach 173% of the phase current magnitude.

Busbar trunking manufacturers may provide harmonic-rated systems specifically designed for given harmonic distortion levels without de-rating, or de-rating factors may apply for standard systems.

Installation and Testing

Pre-Installation

All components should be checked for mechanical damage and tested for insulation resistance before installation. Components should be stored in clean, dry conditions with protection from moisture and corrosive materials.

During Installation

Systems must be fixed to the building in accordance with manufacturer's instructions. Joint surfaces must be clean, and torque settings specified by the manufacturer must be used, as current carrying capacity depends on contact pressure.

Post-Installation Verification

Insulation resistance testing should be performed on the complete system. Note that dielectric (flash) tests made on each unit in the factory should not be repeated on an installed system due to safety hazards, unless a specific risk assessment is carried out.

Safe Working

The Electricity At Work Regulations 1989 must be complied with, particularly Regulation 14 regarding work on live conductors. A risk assessment must be carried out for every situation where live working is contemplated.

Standards Compliance

Busbar trunking systems are governed by BS EN 61439-6:2012, which lays down definitions, service conditions, construction requirements, technical characteristics, and verification requirements for low-voltage busbar trunking systems. Other applicable standards include BS EN 61439-1 for general rules, BS 7671 for electrical installation requirements, and BS EN 60529 for degrees of protection (IP Code).

Conclusion

Low Voltage Busbar Trunking Systems offer a proven, efficient, and flexible solution for modern electrical distribution. Their verified performance, installation efficiency, and adaptability make them increasingly preferable to traditional cable installations, particularly in commercial, industrial, and high-rise applications. Understanding the technical specifications, installation requirements, and safety considerations outlined in the BEAMA Guide helps ensure successful specification, installation, and long-term operation of these systems.

Download the complete guide: BEAMA Guide to Low Voltage Busbar Trunking Systems Verified to BS EN 61439-6

Disclaimer: This article provides a summary of a third-party publication produced by BEAMA. While efforts have been made to accurately represent the content, please refer to the official BEAMA Guide to Low Voltage Busbar Trunking Systems Verified to BS EN 61439-6 for complete technical details. Final design, specification, and implementation decisions should be made by qualified electrical engineers and competent professionals in accordance with all applicable regulations and standards.

Was this article helpful?

Share this article

Related Articles

Circuit Breakers for Direct Current Applications

Circuit Breakers for Direct Current Applications

Aug 1, 2026 · 9 min read

Direct current, which was once the main means of distributing electric power, remains widespread today in electrical plants supplying particular industrial applications. The advantages offered by the use of DC motors and supply through a single line make direct current supply a good solution for railway and…

SpecSizer: Streamlining Generator Set Selection

SpecSizer: Streamlining Generator Set Selection

Jul 19, 2026 · 3 min read

Specifying the correct generator set for a project is a critical engineering task. An undersized genset may fail to support critical loads, while an oversized unit leads to unnecessary capital expenditure, inefficient operation, and higher maintenance costs. Finding the optimal balance requires analyzing site…

Guide to Low Voltage Circuit Breaker Standards

Guide to Low Voltage Circuit Breaker Standards

Jul 19, 2026 · 7 min read

Low voltage circuit-breakers are fundamental components of every electrical installation, providing essential protection against overcurrents and short circuits. However, selecting the correct circuit-breaker for a specific application requires navigating a complex landscape of standards, each designed for different…

Cloud-Based Tool for Electrical Network Design

Cloud-Based Tool for Electrical Network Design

Jul 19, 2026 · 4 min read

Designing an electrical distribution network is a complex task. Electrical engineers, panel builders, and consultants must navigate a maze of standards, perform detailed calculations, and ensure the correct selection and coordination of protection devices, all while managing tight project timelines. The traditional…

Mastering Medium Voltage Design

Mastering Medium Voltage Design

Jul 19, 2026 · 4 min read

Medium voltage (MV) electrical distribution is a critical backbone of modern infrastructure, powering everything from industrial plants and data centers to commercial buildings and utilities. Designing, installing, and maintaining these networks requires a deep understanding of complex technical standards, safety…

Power Suite A Comprehensive Digital Ecosystem for Power Generation Professionals

Power Suite A Comprehensive Digital Ecosystem for Power Generation Professionals

Jul 19, 2026 · 5 min read

The design and specification of power generation systems is a complex, multi-faceted engineering challenge. It requires precise calculations for equipment sizing, careful selection of components, and access to a vast library of technical data. For specifying engineers, contractors, and consultants, having the right…

Understanding Generator Set Ratings

Understanding Generator Set Ratings

Jul 19, 2026 · 9 min read

Generator set ratings may seem complex, but their basic purpose is simple: to fit the application needs at the optimum reliability, performance, and cost. An improper rating means either buying more capacity than needed or risking shorter life to overhaul, more repairs, and more downtime. The key to choosing the right…

Understanding Generator Set Load Factor: Implications for Performance and Longevity

Understanding Generator Set Load Factor: Implications for Performance and Longevity

Jul 19, 2026 · 6 min read

Generator sets (gensets) are critical assets in many facilities, providing emergency backup power or serving as the primary source of electricity in off-grid locations. However, selecting and operating a genset is not simply a matter of matching the nameplate rating to the peak load. One of the most important—and…

Understanding Load Factor: A Key Metric for Electrical Efficiency

Understanding Load Factor: A Key Metric for Electrical Efficiency

Jul 19, 2026 · 6 min read

In the world of electrical engineering and facility management, few metrics offer as much practical insight as load factor. It is a straightforward calculation with serious implications for energy costs, equipment performance, and operational efficiency. For facility managers, energy professionals, and electrical…

Understanding HTM 06-01: Electrical Services Supply and Distribution in Healthcare

Understanding HTM 06-01: Electrical Services Supply and Distribution in Healthcare

Jul 19, 2026 · 6 min read

In the complex environment of a modern healthcare facility, the reliability of the electrical power supply is not just a matter of convenience—it is a matter of life and death. Healthcare premises are increasingly dependent on electrical power to maintain a safe environment, support sophisticated medical equipment…

Understanding and Mitigating Harmonics in Electrical Systems

Understanding and Mitigating Harmonics in Electrical Systems

Jul 19, 2026 · 5 min read

In today's electrical installations, the quality of power is more critical than ever. Modern buildings and industrial facilities are filled with sensitive electronic equipment—computers, variable speed drives, electronic ballasts, and uninterruptible power supplies—that are both susceptible to power quality problems…

Bussmann Series FC2 Available Fault Current Calculator: A Powerful Tool for Electrical Safety and Compliance

Fault Current Calculator: A Powerful Tool for Electrical Safety and Compliance

Jul 19, 2026 · 4 min read

In modern electrical design and safety, understanding the maximum available fault current at various points in an electrical system is non-negotiable. It is a critical parameter that directly influences the selection of overcurrent protective devices, the short-circuit current rating (SCCR) of equipment, and the…

Mastering Power Factor Correction: A Comprehensive Guide to Power Quality

Mastering Power Factor Correction: A Comprehensive Guide to Power Quality

Jul 19, 2026 · 7 min read

In modern electrical installations, power quality is not just a technical concern—it is a financial and operational imperative. Poor power factor leads to higher energy costs, reduced system capacity, increased losses, and potential penalties from utility companies. For engineers, facility managers, and electrical…

Navigating the AI-Driven Data Center: Key Insights from CommScope's 2026 eBook

Navigating the AI-Driven Data Center

Jul 19, 2026 · 5 min read

Artificial intelligence is no longer a futuristic concept—it is the dominant force reshaping the data center landscape today. The rapid evolution of technologies, infrastructures, and architectures for AI is being felt across the entire ecosystem, from massive "AI factories" to enterprise data centers and edge…

Mastering Modern Lighting Design: A Guide to the SLL Lighting Handbook (2018)

Mastering Modern Lighting Design: A Guide to the SLL Lighting Handbook (2018)

Jul 19, 2026 · 8 min read

Lighting is one of the most fundamental elements of the built environment. It shapes how we see, feel, and interact with the spaces we occupy—whether at work, at home, in healthcare facilities, or in public spaces. Good lighting design enhances productivity, improves wellbeing, supports safety and security, and can…

Understanding and Mitigating Harmonics with AC Drives

Understanding and Mitigating Harmonics with AC Drives

Jul 19, 2026 · 5 min read

Harmonic distortion is a growing concern in modern electrical installations. As facilities become increasingly reliant on non-linear loads—such as variable speed drives, computers, electronic lighting, and UPS systems—the quality of the power supply can be significantly degraded. This "electrical pollution" can lead…

Understanding Discrimination with LV Power Circuit-Breakers

Understanding Discrimination with LV Power Circuit-Breakers

Jul 19, 2026 · 4 min read

In any electrical installation, loads are connected to power sources through a succession of protection, isolation, and control devices. When a fault occurs, the primary goal is to disconnect only the faulty part of the network while keeping the rest of the installation energised. This principle is known as…

Streamline Your Motor and Drive Selection with ABB DriveSize

Streamline Your Motor and Drive Selection

Jul 19, 2026 · 3 min read

Selecting the right motor, drive, and transformer for an industrial application is a critical engineering task. An undersized system can lead to failures and downtime, while an oversized one wastes energy and increases costs. To address this challenge, ABB offers DriveSize, a free and powerful software tool designed…

Fuseology The Fundamentals of Overcurrent Protection

Fuseology The Fundamentals of Overcurrent Protection

Jul 19, 2026 · 7 min read

Overcurrent protection is the cornerstone of electrical system safety and reliability. Fuses have served as the "safety valve" of electrical circuits for over a century, providing a simple yet highly effective means of protecting conductors, equipment, and personnel from the destructive effects of overloads and…

The Role of Isolation Transformers in Data Center UPS Systems

The Role of Isolation Transformers in Data Center UPS Systems

Jul 19, 2026 · 5 min read

Every data center power system includes transformers, but their role has evolved significantly over the past 40 years. Modern uninterruptible power supply (UPS) systems have moved away from the bulky internal transformers found in older designs, offering substantial improvements in efficiency, weight, size, and cost…

A secured data centre server aisle with a keypad lock on a cabinet door

Data Centre Application Guide: A Roadmap to Building Future Ready Facilities

Jul 17, 2026 · 2 min read

Designing and building a modern data centre is a complex undertaking. It requires balancing high-performance infrastructure, strict reliability standards, and growing pressure for sustainability. The Data Centre Application Guide from Wesco Anixter is a free, solution-oriented resource designed to help contractors…

Cummins engineer inspecting a large green diesel generator set

Application and Installation Guide for Generator Sets

Jul 17, 2026 · 5 min read

Designing and installing a reliable generator set installation requires careful consideration of standards, regulations, room layouts, fuel systems, exhaust, cooling, and electrical connections. Cummins Power Generation’s Application and Installation Guide for Generator Sets is a comprehensive reference document that…

Row of purple UPS cabinets in a data center aisle with the words "UPS Handbook"

The UPS Handbook: A Comprehensive Guide to Power Protection from Eaton

Jul 17, 2026 · 5 min read

Uninterruptible Power Supplies (UPS) are critical components in modern electrical infrastructure, protecting everything from small office computers to large data centers from the nine common power problems that can cause data loss, hardware damage, and costly downtime. Eaton’s UPS Handbook is a comprehensive guide…

Diagram comparing panelboard, traditional PDU, and modular data center power distribution equipment

Comparing Data Center Power Distribution Architectures

Jul 17, 2026 · 6 min read

The rapid evolution of IT equipment has fundamentally changed how power needs to be delivered in modern data centers. Traditional distribution architectures, developed decades ago, often struggle to meet the demands of high density, frequent equipment refreshes, and the need for flexibility. Schneider Electric’s White…

Single-line diagram of a medium voltage protection scheme with relay and substation connections

Protection Criteria for Medium Voltage Networks

Jul 17, 2026 · 6 min read

Designing a reliable and safe medium voltage (MV) distribution network requires a deep understanding of fault currents, network configurations, and the protection systems that safeguard both equipment and personnel. ABB’s technical guide, "Protection Criteria for Medium Voltage Networks," is an essential resource for…

A technician installing Eaton Bussmann series overcurrent protection devices in a panel

Overcurrent Protection Handbook

Jul 17, 2026 · 4 min read

Overcurrent protection is the cornerstone of electrical safety in any building. The correct selection and application of protective devices ensures not only the safety of personnel but also the reliability of the electrical system and the protection of valuable equipment. Eaton’s Bussmann series Selecting Protective…

A server room aisle inside a data center

Data Center Infrastructure Resource Guide

Jul 17, 2026 · 6 min read

Data centers are the "nerve centers" of the modern economy, housing the critical IT infrastructure that enables organizations to conduct business around the clock and around the world. Anixter’s Data Center Infrastructure Resource Guide is a comprehensive reference document designed to help professionals design…

Join the EBSP Newsletter

Weekly industry news, the latest articles, and engineering updates — straight from practicing electrical engineers. No spam, unsubscribe anytime.